CULTIVATION INTELLIGENCE · v3

Your canopy should run like clockwork

Cyclops creates a harmonious partnership between your operation and what's growing inside of it — and it couldn't be easier.

PLANT-AWARE
Ripple-Down™ scheduling connects your cycles to your plants
TEAM-AWARE
Assign roles, control visibility, communicate clearly
FACILITY-AWARE
Customize every room, every parameter
STRAIN-AWARE
Give every cultivar the rhythm she actually wants
The Cyclops dashboard — cycles, rooms and schedules

Trusted by

Light Brigade Solutions
K. Savage Supply Co.
Leisure Land
Cultivator transplanting a young plant into a fresh tray

— Dynamic scheduling

Plants don't care about plans.

We can influence living things, but we can't control them. And if your scheduling system is rigid, your plants end up paying the price.

Cyclops is powered by Ripple-Down™, a proprietary dynamic scheduling engine built for high-value indoor cultivation. When something changes — a late flip, a tweaked veg window, a strain that needs a different rhythm — the entire system adapts automatically. So you can focus on what matters most: your plants.

— See it in action

The future is adaptable.

See how Cyclops keeps cycles and room timelines connected as plans change.

Adjust a move-in date

Update a cycle once and watch the connected schedule move with it.

Rebalance a veg room

See room timelines respond as timing changes across the plan.

— Mother plant management

Without our moms we're nothing.

Every production cycle starts with a healthy, well-timed mother plant program. Cyclops tracks each strain's mother stock alongside the production plan, so you're never overcrowded and you're never in a bind.

See how mother plant stock, strain demand, and room work stay connected in Cyclops.

Mother plant overview showing current moms, efficiency, and the next action for each strain

Know exactly where every strain stands.

See current mothers, stock health, and the next action for every strain at a glance — and how today's stock lines up with what the plan will need next.

  • Per-strain view of active mother stock
  • Next action and timing for every strain
  • Stock levels measured against upcoming demand
  • Batch history across the full mother lifecycle

Every mother task, queued and dated.

Maintenance work for the mother room is generated from the plan itself. Your team sees exactly what's due, for which strain, on which table — with printable lists for the floor.

  • One prioritized work list for the whole mother room
  • Filter by action, strain, or table
  • Printable lists your team can take to the floor
  • Retirements timed to the strains coming up behind them
Mother room work list showing dated actions by strain and table with printable lists

— Capabilities

Built around how you actually work.

Generic scheduling tools force you to bend your workflow to the software. Cyclops looks at things your way.

01

High level perspectives

Elastic timeline and calendar views provide macro and micro visibility of your entire operation — weeks or months out.

02

Easy room & table tracking

Manage your production schedule at the table and strain level with full lifecycle visibility from propagation to cure.

03

Strain-aware crop planning

Plan around how each cultivar actually behaves, and group cycles in a way that makes sense for your room.

04

Assignable roles & permissions

Precise control of what everyone on your team can see, do and edit.

05

Whiteboard View

Customizable full-screen display communicates everything your team needs to stay on task and in the know.

06

In-app messaging

Level-up your team communication with cycle-aware messaging. Talk to one person or broadcast to the whole team about a specific room.

07

Capacity awareness

Catch overcrowded veg rooms and overbooked dry rooms before they bite you.

08

Cloning & transplant orders

Tell your propagation team exactly what to pull and when, in one click.

09

Any size, any layout

Infinite scaling from a single warehouse to a multi-building campus. Cyclops adapts to your floorplan, not the other way around.

— Perspectives

Zoom out without losing the plant.

Switch instantly between flower, veg, and dry timelines. Filter by building, room, or strain. Spot and fix capacity conflicts long before they happen.

  • Drag to pan, pinch to zoom — gantt-style room timelines
  • Color-coded clone, veg, flower, and capacity-conflict bars
  • Date → Room and Room → Date pivots in one click
  • See capacity issues before they cost you a harvest
Cyclops veg room timeline gantt view across multiple rooms and buildingsCyclops monthly calendar view with active cycles across rooms

— Tasks

Your whiteboard — but better.

Whiteboard Mode shows your team everything they need to succeed. Customizable modular widgets, arranged your way.

Cyclops whiteboard mode with customizable modular widgets

— Mobile

Your whole grow, in your pocket.

Computers and plants don't exactly vibe together. Which is why we have a mobile version to give you the visibility you need, any time, any place. Check your dates, keep tabs on tasks, view and print cloning and transplant orders and message your team all from your phone or tablet.

  • Live cycle cards with timelines and strains, filtered by stage
  • Weekly view of all events and tasks
  • Cycle-aware in-app messaging
  • Same data as desktop, synced in real time
Cyclops mobile In-Flower cycle list expanding Room B9-4 to reveal strains and timeline
Cyclops mobile weekly view with cloning, transplants, move-ins, and harvests
Cyclops mobile navigation drawer with Cycles, Weekly View, Orders, and Messages

— Harvests & Yields

Weigh it. Log it. Done.

As-you-trim data entry turns quick keystrokes into usable insights. Yields, room performance, and strain trends calculate themselves. No spreadsheet, no backlog, no waiting.

Worker in black gloves trimming harvested flower in a tray
01

As-you-trim entry

Log wet, dry, and trimmed weights from any device as the work happens. No paper, no double entry.

02

Instant yield calculation

Pounds-per-light and grams-per-square-foot computed on the fly, per room, per strain, per cycle.

03

Reporting & trend analytics

Compare cycles side-by-side, surface top-performing strains, and export clean PDF or CSV reports in two clicks.

— Pricing

One subscription. Any jurisdiction.

Monthly billing. Unlimited cycles, rooms, and strains. Built to scale from a single flower room to a multi-building campus.

By signing up, you agree to our Terms of Service and Privacy Policy.

No credit card. We'll respond within one business day.